- 256,000 sq ft building
- 38,000 sq ft data center
- No advertising of DataBank name (plain wrapper)
- Security managed 24/7 by permanently assigned staff managed
by a third party security company.
|
- Biometric hand scanner requires ID card access and hand
geometry measurements
- Customer data center access and contacts managed via C-Cure
management system.
- Current government-issued picture ID required
- Second hand scans to gain access to raised floor Biometric
scanner captures 3D measurements of hand
|
- Multiple 360 degree cameras with 10x zoom
- High speed recorders with DV cassette tapes
- Hard drives to eliminate down time for tape swaps and
over recording
- Minimum 30 day tape storage
|
- TXU fault tolerant electrical grid
- 3000 amps of 480v input power – Riser A
- 3000 amps of 480v input power – Riser B
- 800 KVA MGE UPS Systems - Riser A
- 800 KVA MGE UPS Systems - Riser B
- 2.0 megawatt generator (5000 gallon tank) Riser A
- 2.0 megawatt generator (5000 gallon tank) Riser B
|
- Diverse paths to the building
- Feeds to building are encased in concrete
- Fed from two independent substations
- Separate transformers fed from both utility sources for
redundancy
|
- Data Center HVAC system includes (28) 30 Ton Liebert
AHUs.
- Entire system is designed with N+2 redundancy
- Liebert Leak Detect System
|
- Multiple fiber providers for diversity - provides diversity
and redundancy
- Each vendor can deliver additional bandwidth capacity
with minimal turn-around time
- Can be delivered using existing ‘lit’ fiber
- Fiber pathways into the Data Center are truly diverse
- Fiber enters building in steel conduit from multiple points
in the building
|